Report header
—Signatories — names for this day
Treatment layer cement content kg/m³ ·
W:C = ·
column area m² ·
theoretical injection L per metre ·
injection rate L/min.
Change these — and the table columns, signatories and logos — in Setup.
Column records
0 rowsTab next cell · Enter down · arrows to move · drag across cells, Shift+arrows or shift-click to select a block · Ctrl+A selects everything · Ctrl+D fills from the row above · Delete clears the selection in one press · Ctrl+C copies it for Excel. The last row adds a new one automatically. Click a row number to insert or delete a row. Ctrl+Z undoes a typo, Ctrl+Y redoes it. Copy a block in Excel and press Ctrl+V on the first cell to fill across and down.
Day summary
Previous · Today · AccumulatedItem
Previous
Today
Accum.
Report sheet
The official page, exactly as it printsProject to date
Saved days
History log
Every save, setting change and deletion is recorded with the signed-in user and the time. The log cannot be edited from inside the app.
Project
Fixed for every reportThe project name is set on the home screen and shown locked on every daily report. Renaming it here renames the project everywhere. Location and signatory names stay editable day to day, and a new day inherits them from the last day you saved.
Table columns
This site's format — show, hide, rename, insertCalculated columns (teal) keep computing even when hidden. Custom columns appear in the table, on the report sheet and in the day CSV; number columns can show a total on the sheet. The construction number cannot be hidden — everything hangs off it.
Signatories
Boxes print left → right on the report sheetEach box has a title (e.g. Prepared By) and role columns (comma separated, e.g.
Engineer, C.M, P.M). Use ‹ › to reorder. Names are typed per day on the Daily report tab.Paper & printing
Report sheet page setupThe Report sheet preview and the printed page both follow this setting — .
Leave the scale at 100 unless the table runs off the page; 80–90 usually fits a wide table onto A4.
Your browser's print dialog must use the same paper size.
Report logos
Main contractor · JV · DongahUploaded logos are shrunk to print size and stored with the project. They appear on the report sheet header — main contractor first, then the JV partner, with the Dongah mark on the right.
Report header fields
Location, Zone, Phase …Some sites record a single location, others a zone and a phase. Give the second field a label and it appears on the daily report and prints in the sheet header; leave it blank and only the first is used.
Light grouting
Above the treated bodySwitching this on adds four columns — light grouting thickness, theoretical and actual injection and their ratio — plus Total injection columns, which are the treatment and light grouting figures added together. Theoretical injection for the light grouting mix is L per metre at the cement content above. Daily cement and the day summary include the light grouting slurry.
Work categories
Main works · VO · obstruction …These appear in the Category column of the daily table. Anything typed there is learned automatically when the day is saved. The day summary and the dashboard then report columns, treatment length, volume and cement per category — the figures a variation claim needs.
Machines / rigs
Which machine did each columnThese appear as suggestions in the Machine column of the daily table (you can still type anything). Any machine you type on a daily report is added here automatically when the day is saved, so the next day offers it without typing. The dashboard counts completed columns per machine. Hide the Machine column in Table columns if this site doesn't use it.
Mix & geometry constants
Actual toe entered as decides which of the two toe columns you type into — the other is calculated from the ground level. Rows already recorded the other way keep working, so the switch is safe either way. The level datum is written into every level column heading — ground level, top level and toe level — on the table, the report sheet and the CSV export. Type whatever this site uses (mRL, mSHD, mCD, …); columns you renamed by hand keep your own wording.
Theoretical injection per metre =
((Cement ÷ SG) + (Cement × W:C)) × Area — with the values above this is
L/m (workbook cell
V7 = 683.81 L/m).
Daily cement (t) = total actual slurry (L) ÷ slurry volume factor ÷ 1000; the workbook's latest sheet uses
1.05, earlier sheets used the theoretical . See Formulas.Opening balances
Starting point for this projectEvery day's Previous column reads the last saved day before it. A brand-new project starts from zero — type balances here only if this project carries on from an existing spreadsheet.